Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2017 |
Principal Product | Milk |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2026 - Fluid Milk |
Sales | $50,000,000-$100,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 96,000 |
Annual Production | 33,000 Thousand Gallons |
Production Hrs. Annual | 4,160 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $664,426 | 8,586,312 | kWh | $0.08 |
Electricity Demand | $124,537 | 22,607 | kW-months/year | $5.51 |
Electricity Fees | $651 | - | $ | - |
Natural Gas | $185,200 | 39,000 | MMBtu | $4.75 |
TOTAL ENERGY COSTS | $974,814 | |||
RECOMMENDED SAVINGS* | $80,527 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,738 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $61,111 Cost: $160,000 |
$6,230 | 81,438 | $636 | 112 | $54,245 | 11,420 | - | - | - | - |
$6,230 81,438 kWh |
$636 112 kW-months/year |
$54,245 11,420 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,519 Cost: $6,412 |
$5,573 | 72,848 | $568 | 100 | - | - | - | - | $378 | - |
$5,573 72,848 kWh |
$568 100 kW-months/year |
- - MMBtu |
- - $ |
$378 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,025 Cost: $200 |
$1,484 | 19,400 | $321 | 56 | - | - | $(-300) | - | $(-480) | - |
$1,484 19,400 kWh |
$321 56 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,222 Cost: $100 |
$1,830 | 23,920 | $392 | 69 | - | - | - | - | - | - |
$1,830 23,920 kWh |
$392 69 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,456 Cost: $7,000 |
- | - | - | - | $6,456 | 1,365 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,456 1,365 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,529 Cost: $5,865 |
$2,082 | 27,218 | $447 | 78 | - | - | - | - | - | - |
$2,082 27,218 kWh |
$447 78 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2123 INSULATE FEEDWATER TANK |
Savings: $665 Cost: $1,106 |
- | - | - | - | $665 | 139 | - | - | - | - |
- - kWh |
- - kW-months/year |
$665 139 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,527 Cost: $180,683 |
$17,199 | 224,824 | $2,364 | 415 | $61,366 | 12,924 | $(-300) | - | $(-102) | - | $17,199 224,824 kWh |
$2,364 415 kW-months/year |
$61,366 12,924 MMBtu |
$(-300) - $ |
$(-102) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,738 Cost: $13,583 |
$9,139 | 119,466 | $1,336 | 234 | $665 | 139 | $(-300) | - | $(-102) | - | $9,139 119,466 kWh |
$1,336 234 kW-months/year |
$665 139 MMBtu |
$(-300) - $ |
$(-102) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |