Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,198
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0528 # 02 Y:2019 | 02 | 2019 | INSTALL TURBULATORS | $5,011 | $7,500 | Implemented |
UF0528 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,410 | $1,400 | Not Implemented |
UF0528 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $456 | Implemented |
UF0528 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,168 | $6,439 | Not Implemented |
UF0528 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,284 | $3,000 | Implemented |
UF0528 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $2,054 | $1,025 | Implemented |
UF0528 # 08 Y:2019 | 08 | 2019 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $1,676 | $5,000 | Not Implemented |
UD0995 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $3,767 | $0 | Not Implemented |
UD0995 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,443 | $1,500 | Implemented |
UD0995 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $5,974 | $1,800 | Implemented |
UD0995 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,159 | $3,500 | Implemented |
UD0995 # 05 Y:2019 | 05 | 2019 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $110,256 | $150,000 | Not Implemented |
UD0995 # 06 Y:2019 | 06 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $35,713 | $75,000 | Not Implemented |
UD0995 # 07 Y:2019 | 07 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,847 | $11,694 | Implemented |
UD0995 # 08 Y:2019 | 08 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $606 | $0 | Implemented |
UD0995 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,887 | $17,856 | Implemented |
AS0464 # 01 Y:2019 | 01 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $59,350 | $126,000 | Implemented |
AS0464 # 02 Y:2019 | 02 | 2019 | USE SOLAR HEAT FOR HEAT | $48,323 | $319,500 | Not Implemented |
AS0464 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,226 | $2,867 | Not Implemented |
AS0464 # 04 Y:2019 | 04 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $15,760 | $26,200 | Not Implemented |
AS0464 # 05 Y:2019 | 05 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,910 | $3,232 | Not Implemented |
AS0464 # 06 Y:2019 | 06 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $3,137 | $348 | Implemented |
AS0463 # 01 Y:2019 | 01 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $56,524 | $90,000 | Implemented |
AS0463 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,405 | $2,867 | Not Implemented |
AS0463 # 03 Y:2019 | 03 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $11,257 | $18,720 | Not Implemented |