IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,165

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0018 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,604 $50,000 Not Implemented
WM0018 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,860 $488 Not Implemented
WM0018 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $542 $2,210 Not Implemented
WM0018 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $11,838 $1,129 Not Implemented
AM0627 # 01 Y:2012 01 2012 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $66,393 $99,038 Not Implemented
AM0627 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,546 $980 Implemented
AM0627 # 03 Y:2012 03 2012 USE SYNTHETIC LUBRICANT $2,906 $0 Not Implemented
AM0627 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $1,384 $520 Not Implemented
AM0627 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $609 $2,640 Not Implemented
OR0594 # 01 Y:2012 01 2012 INSTALL AN UNINTERUPTABLE POWER SUPPLY $393,360 $20,880 Not Implemented
OR0594 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $163,282 $119,416 Not Implemented
OR0594 # 03 Y:2012 03 2012 Install Anaerobic Digester $1,369,423 $3,468,069 Implemented
OR0594 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,684 $7,360 Implemented
OR0594 # 05 Y:2012 05 2012 INSTALL AUTOMATIC STACK DAMPER $3,989 $5,325 Not Implemented
OR0594 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $2,867 $2,708 Not Implemented
OR0587 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $11,403 $11,403 Not Implemented
OR0587 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,687 $1,000 Not Implemented
OR0587 # 03 Y:2012 03 2012 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,142 $6,108 Not Implemented
OR0587 # 04 Y:2012 04 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,099 $1,560 Not Implemented
OR0587 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,854 $2,854 Implemented
OR0587 # 06 Y:2012 06 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,810 $9,114 Not Implemented
OR0587 # 07 Y:2012 07 2012 Install Anaerobic Digester $75,601 $294,329 Not Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0419 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,754 $2,287 Not Implemented
SF0419 # 03 Y:2012 03 2012 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,176 $963 Not Implemented