IAC Assessment: UM0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2014
Principal Product Milk, cream, yogurt, sour cream, ice cream mix, egg nog
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 62,000
Annual Production 61,500,000 Pounds
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $479,242 4,225,420 kWh $0.11
Natural Gas $234,814 52,500 MMBtu $4.47
TOTAL ENERGY COSTS $714,056
RECOMMENDED SAVINGS* $240,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$166,000
Cost:
$500,000
$198,000 1,750,000 $(-32,000) (-7,070) $198,000
1,750,000
kWh
$(-32,000)
(-7,070)
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,060
Cost:
$9,750
$6,060 53,660 - - $6,060
53,660
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,150
Cost:
$2,500
$2,150 19,020 - - $2,150
19,020
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$28,000
Cost:
$50,000
- - $28,000 6,195 -
-
kWh
$28,000
6,195
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$26,800
Cost:
$40,000
- - $26,800 5,870 -
-
kWh
$26,800
5,870
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$11,000
Cost:
$4,000
- - $11,000 2,411 -
-
kWh
$11,000
2,411
MMBtu
TOTAL RECOMMENDED Savings:
$240,010
Cost:
$606,250
$206,210 1,822,680 $33,800 7,406 $206,210
1,822,680
kWh
$33,800
7,406
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas