Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0799 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,927 | $3,514 | n/a |
OR0799 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,006 | $11,189 | n/a |
OR0799 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,659 | $399,900 | n/a |
OR0799 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,039 | $0 | n/a |
OR0799 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,971 | $41,770 | n/a |
OR0710 # 04 Y:2018 | 04 | 2018 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $19,538 | $19,269 | Not Implemented |
OR0710 # 01 Y:2018 | 01 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $80,821 | $56,937 | Not Implemented |
OR0710 # 03 Y:2018 | 03 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $15,485 | $1,280 | Not Implemented |
OR0710 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,410 | $3,742 | Not Implemented |
OR0710 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,550 | $1,000 | Not Implemented |
OR0710 # 02 Y:2018 | 02 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $31,220 | $60,550 | Not Implemented |
OR0710 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,922 | $12,567 | Not Implemented |
OR0709 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,418 | $45,772 | Not Implemented |
OR0709 # 04 Y:2018 | 04 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,664 | $1,000 | Not Implemented |
OR0709 # 03 Y:2018 | 03 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,478 | $1,000 | Not Implemented |
OR0709 # 01 Y:2018 | 01 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $60,750 | $77,700 | Not Implemented |
OR0709 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,023 | $49,521 | Not Implemented |
OR0709 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,210 | $0 | Not Implemented |
OR0709 # 07 Y:2018 | 07 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $1,651 | $7,363 | Not Implemented |
OR0672 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,775 | $138,248 | Not Implemented |
OR0672 # 02 Y:2016 | 02 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $21,014 | $35,396 | Not Implemented |
OR0672 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,924 | $26,614 | Not Implemented |
OR0656 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,308,919 | $1,300,000 | Implemented |
OR0656 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $317,386 | $0 | Not Implemented |
OR0656 # 02 Y:2015 | 02 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $188,688 | $247,000 | Implemented |