Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0818 # 04 Y:2020 | 04 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $7,500 | $1,300 | Implemented |
AM0818 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $340 | $550 | Implemented |
AM0818 # 10 Y:2020 | 10 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $160 | $150 | Implemented |
AM0818 # 01 Y:2020 | 01 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,029,555 | $25,000 | Implemented |
AM0818 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,370 | $45 | Not Implemented |
AM0818 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,800 | $1,260 | Not Implemented |
AM0818 # 06 Y:2020 | 06 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,910 | $4,570 | Not Implemented |
AM0818 # 09 Y:2020 | 09 | 2020 | PAY UTILITY BILLS ON TIME | $256 | $0 | Implemented |
AM0818 # 07 Y:2020 | 07 | 2020 | USE PHOTOCELL CONTROLS | $700 | $450 | Implemented |
AM0818 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $3,170 | $524 | Implemented |
UA0227 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,028 | $2,600 | Not Implemented |
UA0227 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,466 | $1,345 | Implemented |
UA0227 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,527 | $250 | Not Implemented |
UA0227 # 04 Y:2020 | 04 | 2020 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $65,276 | $72,800 | Implemented |
UA0227 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,805 | $100,000 | Not Implemented |
UA0227 # 06 Y:2020 | 06 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,578 | $200 | Not Implemented |
UA0227 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,570 | $5,639 | Implemented |
UF0551 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,254 | $4,938 | Implemented |
UF0551 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $1,032,365 | $4,965,000 | Implemented |
UF0551 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,166 | $0 | Implemented |
UF0551 # 07 Y:2020 | 07 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,687 | $1,936 | Implemented |
UF0551 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,189 | $1,500 | Implemented |
UF0551 # 02 Y:2020 | 02 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $537,853 | $1,400,000 | Implemented |
UF0551 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,520 | $30,000 | Implemented |
UF0551 # 04 Y:2020 | 04 | 2020 | INSTALL TURBULATORS | $18,151 | $7,500 | Not Implemented |