IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0818 # 04 Y:2020 04 2020 REPAIR OR REPLACE STEAM TRAPS $7,500 $1,300 Implemented
AM0818 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $340 $550 Implemented
AM0818 # 10 Y:2020 10 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $160 $150 Implemented
AM0818 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,029,555 $25,000 Implemented
AM0818 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,370 $45 Not Implemented
AM0818 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,800 $1,260 Not Implemented
AM0818 # 06 Y:2020 06 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,910 $4,570 Not Implemented
AM0818 # 09 Y:2020 09 2020 PAY UTILITY BILLS ON TIME $256 $0 Implemented
AM0818 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $700 $450 Implemented
AM0818 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $3,170 $524 Implemented
UA0227 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,028 $2,600 Not Implemented
UA0227 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,466 $1,345 Implemented
UA0227 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,527 $250 Not Implemented
UA0227 # 04 Y:2020 04 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $65,276 $72,800 Implemented
UA0227 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $45,805 $100,000 Not Implemented
UA0227 # 06 Y:2020 06 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,578 $200 Not Implemented
UA0227 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,570 $5,639 Implemented
UF0551 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,254 $4,938 Implemented
UF0551 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,032,365 $4,965,000 Implemented
UF0551 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $0 Implemented
UF0551 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,687 $1,936 Implemented
UF0551 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,189 $1,500 Implemented
UF0551 # 02 Y:2020 02 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $537,853 $1,400,000 Implemented
UF0551 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,520 $30,000 Implemented
UF0551 # 04 Y:2020 04 2020 INSTALL TURBULATORS $18,151 $7,500 Not Implemented