Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
79
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0818 # 04 Y:2020 | 04 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $7,500 | $1,300 | Implemented |
AM0818 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $340 | $550 | Implemented |
AM0818 # 10 Y:2020 | 10 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $160 | $150 | Implemented |
AM0818 # 01 Y:2020 | 01 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,029,555 | $25,000 | Implemented |
AM0818 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,370 | $45 | Not Implemented |
AM0818 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,800 | $1,260 | Not Implemented |
AM0818 # 06 Y:2020 | 06 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,910 | $4,570 | Not Implemented |
AM0818 # 09 Y:2020 | 09 | 2020 | PAY UTILITY BILLS ON TIME | $256 | $0 | Implemented |
AM0818 # 07 Y:2020 | 07 | 2020 | USE PHOTOCELL CONTROLS | $700 | $450 | Implemented |
AM0818 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $3,170 | $524 | Implemented |
UA0227 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,028 | $2,600 | Not Implemented |
UA0227 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,466 | $1,345 | Implemented |
UA0227 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,527 | $250 | Not Implemented |
UA0227 # 04 Y:2020 | 04 | 2020 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $65,276 | $72,800 | Implemented |
UA0227 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,805 | $100,000 | Not Implemented |
UA0227 # 06 Y:2020 | 06 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,578 | $200 | Not Implemented |
UA0227 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,570 | $5,639 | Implemented |
UF0551 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,254 | $4,938 | Implemented |
UF0551 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $1,032,365 | $4,965,000 | Implemented |
UF0551 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,166 | $0 | Implemented |
UF0551 # 07 Y:2020 | 07 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,687 | $1,936 | Implemented |
UF0551 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,189 | $1,500 | Implemented |
UF0551 # 02 Y:2020 | 02 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $537,853 | $1,400,000 | Implemented |
UF0551 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,520 | $30,000 | Implemented |
UF0551 # 04 Y:2020 | 04 | 2020 | INSTALL TURBULATORS | $18,151 | $7,500 | Not Implemented |