IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
NAICS 311511 Fluid Milk Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0125 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,438 $1,074 Implemented
MI0125 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $9,589 $850 Implemented
MI0125 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,013 $395 Implemented
SU0209 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,769 $0 Implemented
SU0209 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,742 $509 Implemented
SU0209 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,683 $418 Implemented
SU0209 # 06 Y:2005 06 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $16,000 Implemented
SU0209 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $1,072 $1,000 Implemented
MI0099 # 01 Y:2005 01 2005 REPLACE BOILER $31,718 $82,200 Implemented
MI0099 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $11,973 $2,750 Implemented
MI0099 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,897 $470 Implemented
MI0099 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,355 $1,750 Implemented
MI0099 # 07 Y:2005 07 2005 USE MINIMUM STEAM OPERATING PRESSURE $200 $115 Implemented
LL0207 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,769 $16,000 Implemented
LL0207 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $34,833 $7,488 Implemented
LL0207 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,149 $1,960 Implemented
LL0207 # 10 Y:2004 10 2004 $46,500 $3,150 Implemented
SU0197 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,966 $0 Implemented
SU0197 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,301 $154 Implemented
SU0197 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,462 $725 Implemented
SU0197 # 07 Y:2004 07 2004 USE SYNTHETIC LUBRICANT $2,982 $1,000 Implemented
SU0197 # 09 Y:2004 09 2004 OPTIMIZE PLANT POWER FACTOR $2,001 $6,941 Implemented
WV0305 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,442 $1,774 Implemented
WV0305 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,562 $221 Implemented
WV0305 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,370 $6,052 Implemented