IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 311511 Fluid Milk Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0551 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,687 $1,936 Implemented
UF0551 # 02 Y:2020 02 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $537,853 $1,400,000 Implemented
UF0551 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,032,365 $4,965,000 Implemented
UF0551 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $0 Implemented
UF0551 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,254 $4,938 Implemented
UF0551 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,189 $1,500 Implemented
UF0551 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,520 $30,000 Implemented
UF0528 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $2,054 $1,025 Implemented
UF0528 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,284 $3,000 Implemented
UF0528 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $456 Implemented
UF0528 # 02 Y:2019 02 2019 INSTALL TURBULATORS $5,011 $7,500 Implemented
UF0443 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $19,349 $2,235 Implemented
UF0443 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $562 $75 Implemented
UF0443 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,731 $42,492 Implemented
UF0443 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,607 $0 Implemented
MI0142 # 05 Y:2007 05 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,540 $850 Implemented
MI0142 # 02 Y:2007 02 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $70,674 $34 Implemented
MI0125 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,013 $395 Implemented
MI0125 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $9,589 $850 Implemented
MI0125 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,438 $1,074 Implemented
MI0125 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $32,634 $35,000 Implemented
MI0125 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $61,073 $1,290 Implemented
MI0099 # 01 Y:2005 01 2005 REPLACE BOILER $31,718 $82,200 Implemented
MI0099 # 07 Y:2005 07 2005 USE MINIMUM STEAM OPERATING PRESSURE $200 $115 Implemented
MI0099 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,897 $470 Implemented