Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
563
matching recommendationsNAICS | 311511 | Fluid Milk Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0585 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,720 | $3,590 | Implemented |
CO0585 # 08 Y:2006 | 08 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,430 | $2,950 | Not Implemented |
CO0585 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $719 | $110 | Implemented |
CO0585 # 10 Y:2006 | 10 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $290 | $200 | Implemented |
OK0729 # 01 Y:2006 | 01 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,248 | $15,150 | Not Implemented |
OK0729 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,516 | $4,800 | Not Implemented |
OK0729 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,820 | $3,090 | Not Implemented |
OK0729 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,968 | $18,960 | Not Implemented |
OK0729 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,965 | $3,244 | Not Implemented |
MI0125 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $61,073 | $1,290 | Implemented |
MI0125 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,374 | $75,894 | Not Implemented |
MI0125 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,634 | $35,000 | Implemented |
MI0125 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,438 | $1,074 | Implemented |
MI0125 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,589 | $850 | Implemented |
MI0125 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,852 | $4,800 | Not Implemented |
MI0125 # 07 Y:2006 | 07 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,013 | $395 | Implemented |
SU0209 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,769 | $0 | Implemented |
SU0209 # 02 Y:2005 | 02 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,851 | $0 | Not Implemented |
SU0209 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,742 | $509 | Implemented |
SU0209 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,683 | $418 | Implemented |
SU0209 # 05 Y:2005 | 05 | 2005 | INSTALL TURBULATORS | $1,988 | $500 | Not Implemented |
SU0209 # 06 Y:2005 | 06 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $16,000 | Implemented |
SU0209 # 07 Y:2005 | 07 | 2005 | USE SYNTHETIC LUBRICANT | $1,072 | $1,000 | Implemented |
SU0209 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,558 | $8,908 | Not Implemented |
MI0099 # 01 Y:2005 | 01 | 2005 | REPLACE BOILER | $31,718 | $82,200 | Implemented |