IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

544

matching recommendations
Reset
NAICS 311511 Fluid Milk Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0528 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,284 $3,000 Implemented
UF0528 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $2,054 $1,025 Implemented
UF0528 # 08 Y:2019 08 2019 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $1,676 $5,000 Not Implemented
AS0464 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $59,350 $126,000 Implemented
AS0464 # 02 Y:2019 02 2019 USE SOLAR HEAT FOR HEAT $48,323 $319,500 Not Implemented
AS0464 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,226 $2,867 Not Implemented
AS0464 # 04 Y:2019 04 2019 INCREASE EFFICIENCY OF TRUCKS $15,760 $26,200 Not Implemented
AS0464 # 05 Y:2019 05 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,910 $3,232 Not Implemented
AS0464 # 06 Y:2019 06 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,137 $348 Implemented
AS0463 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $56,524 $90,000 Implemented
AS0463 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,405 $2,867 Not Implemented
AS0463 # 03 Y:2019 03 2019 INCREASE EFFICIENCY OF TRUCKS $11,257 $18,720 Not Implemented
AS0463 # 04 Y:2019 04 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,082 $3,232 Not Implemented
AS0463 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,693 $0 Implemented
AS0463 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $6,295 Implemented
SU0469 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,006 $0 Not Implemented
SU0469 # 02 Y:2018 02 2018 ELIMINATE/REDUCE AN OPERATION $6,208 $888 Not Implemented
SU0469 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $995 $734 Implemented
SU0469 # 04 Y:2018 04 2018 REDUCE VENTILATION AIR $1,085 $882 Not Implemented
SU0469 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,395 $32,434 Implemented
SU0469 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $513 $531 Implemented
SU0469 # 07 Y:2018 07 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $2,737 $3,700 Not Implemented
SU0469 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,119 $40,600 Not Implemented
SU0468 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,204 $316 Not Implemented
SU0468 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $2,578 $1,066 Not Implemented