IAC logo
IAC Assessment: UU0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2020
Principal Product Bottled milk, cottage cheese, orange juice
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $1,000,000-$5,000,000
# of Employees 300
Plant Area (Sq.Ft.) 92,350
Annual Production 10,500,000 Pounds
Production Hrs. Annual 8,720
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $520,234 15,818,880 kWh $0.03
Electricity Demand $410,617 30,215 kW-months/year $13.59
Electricity Fees $74,307 - $ -
Natural Gas $270,305 74,100 MMBtu $3.65
TOTAL ENERGY COSTS $2,455,328
RECOMMENDED SAVINGS* $192,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,470
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$47,740
Cost:
$212,490
- - - - $(-1,840) - $28,990 7,950 $5,650 3,740 $14,940 3,740 - - -
-
kWh
-
-
kW-months/year
$(-1,840)
-
$
$28,990
7,950
MMBtu
$5,650
3,740
Tgal
$14,940
3,740
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,050
Cost:
$179,660
$26,240 795,110 $14,810 1,090 - - - - - - - - - - $26,240
795,110
kWh
$14,810
1,090
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$30,330
Cost:
$4,800
$25,050 759,060 $5,280 389 - - - - - - - - - - $25,050
759,060
kWh
$5,280
389
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$14,460
Cost:
$13,100
- - - - - - - - $3,970 2,630 $10,490 2,630 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,970
2,630
Tgal
$10,490
2,630
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,220
Cost:
$23,540
$5,160 156,390 $3,060 225 - - - - - - - - - - $5,160
156,390
kWh
$3,060
225
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$960
Cost:
$1,140
$610 18,550 $350 26 - - - - - - - - - - $610
18,550
kWh
$350
26
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
07: 2.8124 Hire Energy Manager Savings:
$50,000
Cost:
$2,700
- - - - - - - - - - - - $50,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$50,000
-
$
TOTAL RECOMMENDED Savings:
$192,760
Cost:
$437,430
$57,060 1,729,110 $23,500 1,729 $(-1,840) - $28,990 7,950 $9,620 6,370 $25,430 6,370 $50,000 - $57,060
1,729,110
kWh
$23,500
1,729
kW-months/year
$(-1,840)
-
$
$28,990
7,950
MMBtu
$9,620
6,370
Tgal
$25,430
6,370
Tgal
$50,000
-
$
TOTAL IMPLEMENTED Savings:
$111,470
Cost:
$428,790
$31,400 951,500 $17,870 1,315 $(-1,840) - $28,990 7,950 $9,620 6,370 $25,430 6,370 - - $31,400
951,500
kWh
$17,870
1,315
kW-months/year
$(-1,840)
-
$
$28,990
7,950
MMBtu
$9,620
6,370
Tgal
$25,430
6,370
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Personnel Changes