Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 311511 | Fluid Milk Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0547 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $403 | $840 | Not Implemented |
AS0547 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,601 | $1,271 | Not Implemented |
AS0547 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,089 | $2,817 | Not Implemented |
AS0547 # 02 Y:2023 | 02 | 2023 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,631 | $410 | Not Implemented |
AS0547 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,944 | $3,750 | Not Implemented |
AS0484 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,035 | $5,600 | Not Implemented |
AS0484 # 03 Y:2020 | 03 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $26,610 | $79,200 | Implemented |
AS0484 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $61,233 | $231,375 | Not Implemented |
AS0484 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $1,259,928 | $10,007,562 | Implemented |
AS0471 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $157 | $0 | Implemented |
AS0471 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $85,359 | $279,692 | Implemented |
AS0471 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,374 | $5,020 | Not Implemented |
AS0471 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,003 | $2,108 | Not Implemented |
AS0464 # 06 Y:2019 | 06 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $3,137 | $348 | Implemented |
AS0464 # 05 Y:2019 | 05 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,910 | $3,232 | Not Implemented |
AS0464 # 04 Y:2019 | 04 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $15,760 | $26,200 | Not Implemented |
AS0464 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,226 | $2,867 | Not Implemented |
AS0464 # 02 Y:2019 | 02 | 2019 | USE SOLAR HEAT FOR HEAT | $48,323 | $319,500 | Not Implemented |
AS0464 # 01 Y:2019 | 01 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $59,350 | $126,000 | Implemented |
AS0463 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,693 | $0 | Implemented |
AS0463 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,398 | $6,295 | Implemented |
AS0463 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,082 | $3,232 | Not Implemented |
AS0463 # 03 Y:2019 | 03 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $11,257 | $18,720 | Not Implemented |
AS0463 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,405 | $2,867 | Not Implemented |
AS0463 # 01 Y:2019 | 01 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $56,524 | $90,000 | Implemented |