IAC logo
IAC Assessment: AS0484
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0484
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Fluid Milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales <$500,000
# of Employees 120
Plant Area (Sq.Ft.) 8,800,000
Annual Production 21,900 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,468,532 34,573,202 kWh $0.04
Electricity Demand $397,710 79,542 kW-months/year $5.00
Electricity Fees $56,951 - $ -
Other Energy $38,081 2,297 MMBtu $16.58
TOTAL ENERGY COSTS $1,961,274
RECOMMENDED SAVINGS* $1,349,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,286,538
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.9141 Install Anaerobic Digester Savings:
$1,259,928
Cost:
$10,007,562
- - - - - - - - $866,006 - $393,922 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$866,006
-
$
$393,922
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$61,233
Cost:
$231,375
$52,769 1,235,803 $8,464 1,693 - - - - - - - - $52,769
1,235,803
kWh
$8,464
1,693
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$26,610
Cost:
$79,200
- - - - $(-9,176) (-2,244) $35,786 2,244 - - - - -
-
kWh
-
-
kW-months/year
$(-9,176)
(-2,244)
MMBtu
$35,786
2,244
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,035
Cost:
$5,600
$1,754 40,982 $281 56 - - - - - - - - $1,754
40,982
kWh
$281
56
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,349,806
Cost:
$10,323,737
$54,523 1,276,785 $8,745 1,749 $(-9,176) (-2,244) $35,786 2,244 $866,006 - $393,922 - $54,523
1,276,785
kWh
$8,745
1,749
kW-months/year
$(-9,176)
(-2,244)
MMBtu
$35,786
2,244
MMBtu
$866,006
-
$
$393,922
-
$
TOTAL IMPLEMENTED Savings:
$1,286,538
Cost:
$10,086,762
- - - - $(-9,176) (-2,244) $35,786 2,244 $866,006 - $393,922 - -
-
kWh
-
-
kW-months/year
$(-9,176)
(-2,244)
MMBtu
$35,786
2,244
MMBtu
$866,006
-
$
$393,922
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production