Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 311511 | Fluid Milk Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0506 # 04 Y:2021 | 04 | 2021 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $108,239 | $800,000 | Not Implemented |
LE0506 # 03 Y:2021 | 03 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $36,412 | $80,000 | Not Implemented |
LE0506 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,519 | $5,000 | Not Implemented |
LE0506 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,556 | $11,500 | Not Implemented |
LE0309 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,018 | $2,431 | Implemented |
LE0309 # 08 Y:2010 | 08 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,494 | $40 | Implemented |
LE0309 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,657 | $1,000 | Implemented |
LE0309 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,925 | $0 | Implemented |
LE0309 # 01 Y:2010 | 01 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $189,768 | $90,000 | Not Implemented |
LE0309 # 02 Y:2010 | 02 | 2010 | INSULATE BARE EQUIPMENT | $23,403 | $5,772 | Implemented |
LE0309 # 03 Y:2010 | 03 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $21,770 | $250 | Implemented |
LE0309 # 04 Y:2010 | 04 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,145 | $20,000 | Not Implemented |
LE0309 # 05 Y:2010 | 05 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,117 | $30,000 | Not Implemented |
LE0245 # 02 Y:2006 | 02 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $47,703 | $5,000 | Not Implemented |
LE0245 # 01 Y:2006 | 01 | 2006 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $318,192 | $1,250 | Not Implemented |
LE0245 # 10 Y:2006 | 10 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,488 | $1,000 | Not Implemented |
LE0245 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,796 | $3,000 | Implemented |
LE0245 # 08 Y:2006 | 08 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,646 | $2,500 | Not Implemented |
LE0245 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,030 | $2,000 | Not Implemented |
LE0245 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,828 | $8,700 | Implemented |
LE0245 # 05 Y:2006 | 05 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,138 | $2,500 | Implemented |
LE0245 # 04 Y:2006 | 04 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $41,698 | $30,000 | Not Implemented |
LE0245 # 03 Y:2006 | 03 | 2006 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $43,680 | $5,000 | Not Implemented |
SU0209 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,769 | $0 | Implemented |
SU0209 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,558 | $8,908 | Not Implemented |