IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 311511 Fluid Milk Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0125 # 09 Y:2019 09 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,644 $3,670 Not Implemented
BS0125 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $143 $260 Not Implemented
BS0125 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $2,168 $10,162 Not Implemented
BS0125 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $50 Not Implemented
BS0125 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,903 $4,567 Not Implemented
BS0125 # 05 Y:2019 05 2019 REPAIR OR REPLACE STEAM TRAPS $7,006 $5,147 Not Implemented
BS0125 # 06 Y:2019 06 2019 UPGRADE OBSOLETE EQUIPMENT $4,616 $8,000 Not Implemented
BS0125 # 07 Y:2019 07 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $12,064 $54,000 Not Implemented
BS0125 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $615 Not Implemented
BS0125 # 10 Y:2019 10 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,813 $5,325 Not Implemented
BS0125 # 11 Y:2019 11 2019 AVOID FROST FORMATION ON EVAPORATORS $2,258 $618 Not Implemented
UU0151 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,760 $100 Not Implemented
UU0151 # 01 Y:2019 01 2019 OPERATE BOILERS ON HIGH FIRE SETTING $63,057 $1,000 Not Implemented
UU0151 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $17,315 $25,000 Not Implemented
UU0151 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,711 $37,970 Not Implemented
UU0151 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,969 $1,000 Not Implemented
UU0151 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,157 $1,000 Not Implemented
UU0151 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,973 $7,800 Not Implemented
AS0471 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,003 $2,108 Not Implemented
AS0471 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,374 $5,020 Not Implemented
AS0471 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85,359 $279,692 Implemented
AS0471 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $157 $0 Implemented
UF0528 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $456 Implemented
UF0528 # 08 Y:2019 08 2019 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $1,676 $5,000 Not Implemented
UF0528 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $2,054 $1,025 Implemented