IAC logo
IAC Assessment: UU0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Cheese and Yogurt
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $100,000,000-$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 800,000
Annual Production 165,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $846,705 23,261,122 kWh $0.04
Electricity Demand $639,314 37,919 kW-months/year $16.86
Electricity Fees $107,517 - $ -
Natural Gas $467,099 122,286 MMBtu $3.82
TOTAL ENERGY COSTS $2,060,635
RECOMMENDED SAVINGS* $107,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$63,057
Cost:
$1,000
- - - - - - $63,057 16,507 -
-
kWh
-
-
kW-months/year
-
-
$
$63,057
16,507
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,315
Cost:
$25,000
- - - - $17,315 - - - -
-
kWh
-
-
kW-months/year
$17,315
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,711
Cost:
$37,970
$6,446 177,080 $4,265 253 - - - - $6,446
177,080
kWh
$4,265
253
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,969
Cost:
$1,000
$3,632 100,901 $2,337 139 - - - - $3,632
100,901
kWh
$2,337
139
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,157
Cost:
$1,000
$4,355 120,970 $2,802 166 - - - - $4,355
120,970
kWh
$2,802
166
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,973
Cost:
$7,800
$1,973 54,800 - - - - - - $1,973
54,800
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,760
Cost:
$100
- - $1,760 104 - - - - -
-
kWh
$1,760
104
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$107,942
Cost:
$73,870
$16,406 453,751 $11,163 662 $17,315 - $63,057 16,507 $16,406
453,751
kWh
$11,163
662
kW-months/year
$17,315
-
$
$63,057
16,507
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas