IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 311514 Dry, Condensed, and Evaporated Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0958 # 12 Y:2016 12 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,996 $0 Implemented
OK0958 # 11 Y:2016 11 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,955 $100,000 Implemented
OK0958 # 10 Y:2016 10 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,151 $70,000 Implemented
OK0958 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,455 $0 Implemented
OK0958 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,461 $2,000 Implemented
OK0958 # 03 Y:2016 03 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,914 $3,250 Implemented
OK0958 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $9,149 Implemented
SU0426 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,669 $7,515 Implemented
SU0426 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,690 $110,000 Implemented
SF0492 # 11 Y:2016 11 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $12,365 $30,659 Implemented
SF0492 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $8,681 $17,643 Implemented
SF0492 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $165 $292 Implemented
SF0492 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $7,565 $13,378 Implemented
SF0492 # 01 Y:2016 01 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $13,265 $280 Implemented
SF0492 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $218 $33 Implemented
SF0492 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,076 $5,200 Implemented
SF0492 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,543 $7,437 Implemented
SF0492 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,830 $14,614 Implemented
SF0492 # 06 Y:2016 06 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,794 $15,281 Implemented
SF0492 # 07 Y:2016 07 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,867 $11,727 Implemented
BS0070 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $13,590 $12,584 Implemented
BS0070 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,026 $744 Implemented
BS0070 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $2,153 $213 Implemented
BS0070 # 04 Y:2016 04 2016 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,079 $4,500 Implemented
BS0070 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $418 $14 Implemented