IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

206

matching recommendations
Reset
NAICS 31152 Ice Cream and Frozen Dessert Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0223 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,766 $26,767 Implemented
UU0223 # 01 Y:2023 01 2023 ELIMINATE SHIFT $171,281 $5,500 Implemented
UU0223 # 04 Y:2023 04 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $3,305 $11,743 Implemented
UU0223 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,735 $51,600 Implemented
UU0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $277 $142 Implemented
SD0601 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $360 Not Implemented
SD0601 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $225 Implemented
SD0601 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $295 $504 Implemented
SD0601 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $714 $1,555 Implemented
UD1018 # 03 Y:2020 03 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $25,124 $0 Not Implemented
UD1018 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $359 $392 Not Implemented
UD1018 # 04 Y:2020 04 2020 REDESIGN PROCESS $43,180 $20,000 Not Implemented
UD1018 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,072 $0 Not Implemented
UD1018 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,174 $26,600 Not Implemented
UD1018 # 06 Y:2020 06 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $16,717 $64,900 Not Implemented
UD1018 # 09 Y:2020 09 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $1,096,761 $5,000,000 Not Implemented
UD1018 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,584 $1,500 Not Implemented
UD1018 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Not Implemented
UU0161 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $6,880 Implemented
UU0161 # 05 Y:2020 05 2020 ISOLATE HOT OR COLD EQUIPMENT $2,460 $9,000 Not Implemented
UU0161 # 01 Y:2020 01 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $43,260 $86,000 Implemented
UU0161 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,315 $7,880 Implemented
UU0161 # 02 Y:2020 02 2020 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $22,840 $53,000 Implemented
UU0161 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,370 $5,370 Not Implemented
IP0130 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $547 $0 Not Implemented