Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
215
matching recommendationsNAICS | 31152 | Ice Cream and Frozen Dessert Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0092 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,594 | $1,000 | Implemented |
MZ0092 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,547 | $26,468 | Not Implemented |
MZ0092 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $6,999 | $3,738 | Implemented |
MZ0092 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,645 | $26,468 | Not Implemented |
MZ0092 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,516 | $263 | Implemented |
MZ0092 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $567 | $140 | Implemented |
MZ0092 # 09 Y:2012 | 09 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $512 | $212 | Not Implemented |
LE0290 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,385 | $1,200 | Not Implemented |
LE0290 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,837 | $15,700 | Not Implemented |
LE0290 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,929 | $2,000 | Not Implemented |
LE0290 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,543 | $750 | Implemented |
LE0290 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,148 | $152 | Not Implemented |
LE0290 # 06 Y:2009 | 06 | 2009 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,400 | $500 | Not Implemented |
LE0290 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,267 | $0 | Implemented |
LE0290 # 08 Y:2009 | 08 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,204 | $2,500 | Implemented |
LE0290 # 09 Y:2009 | 09 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,150 | $2,500 | Implemented |
LE0290 # 10 Y:2009 | 10 | 2009 | INSTALL OCCUPANCY SENSORS | $1,045 | $0 | Implemented |
LE0290 # 11 Y:2009 | 11 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $900 | $1,500 | Not Implemented |
LE0290 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $2,500 | Implemented |
SF0360 # 01 Y:2008 | 01 | 2008 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $103 | $0 | Implemented |
SF0360 # 02 Y:2008 | 02 | 2008 | COMBINE UTILITY METERS | $1,439 | $1,210 | Not Implemented |
SF0360 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,717 | $10,269 | Implemented |
UU0095 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,360 | $2,000 | Implemented |
UU0095 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,800 | $20,000 | Not Implemented |
UU0095 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,985 | $40,000 | Not Implemented |