IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

215

matching recommendations
Reset
NAICS 31152 Ice Cream and Frozen Dessert Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0101 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $51,010 $72,500 Not Implemented
MI0101 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,178 $180 Implemented
MI0101 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,508 $3,000 Not Implemented
MI0101 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,336 $600 Not Implemented
MI0101 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,200 $6,660 Implemented
MI0101 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,386 $1,030 Implemented
MI0101 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $294 $195 Not Implemented
GT0780 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,020 $11,903 Implemented
GT0780 # 02 Y:2004 02 2004 INSTALL TURBULATORS $11,482 $12,800 n/a
GT0780 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,654 $10,261 Implemented
GT0780 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $25,046 $92,125 Not Implemented
GT0780 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,772 $500 Implemented
GT0780 # 06 Y:2004 06 2004 COMBINE UTILITY METERS $23,320 $0 Not Implemented
GT0780 # 07 Y:2004 07 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,729 $1,209 Implemented
GT0780 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,512 $0 Not Implemented
GT0780 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,453 $900 Implemented
GT0780 # 10 Y:2004 10 2004 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $12,344 $20,000 Not Implemented
GT0780 # 11 Y:2004 11 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,325 $1,600 Not Implemented
GT0780 # 12 Y:2004 12 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $2,490 $800 Implemented
SF0275 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,063 $739 Not Implemented
SF0275 # 02 Y:2004 02 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $49,562 $39,000 Implemented
SF0275 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,238 $0 Implemented
SF0275 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,909 $3,688 Implemented
SF0275 # 05 Y:2004 05 2004 COVER OPEN TANKS $715 $1,469 Not Implemented
SF0275 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $12,835 Not Implemented