Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 31152 | Ice Cream and Frozen Dessert Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0559 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $355 | $416 | Implemented |
CO0559 # 03 Y:2004 | 03 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,190 | $740 | Implemented |
CO0559 # 04 Y:2004 | 04 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,180 | $810 | Implemented |
CO0559 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $710 | $1,790 | Implemented |
CO0559 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $1,760 | $2,260 | Implemented |
CO0559 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $572 | $292 | Implemented |
CO0559 # 08 Y:2004 | 08 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $650 | $4,550 | Not Implemented |
CO0559 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,070 | $440 | Implemented |
GT0780 # 06 Y:2004 | 06 | 2004 | COMBINE UTILITY METERS | $23,320 | $0 | Not Implemented |
GT0780 # 12 Y:2004 | 12 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $2,490 | $800 | Implemented |
GT0780 # 11 Y:2004 | 11 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,325 | $1,600 | Not Implemented |
GT0780 # 10 Y:2004 | 10 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $12,344 | $20,000 | Not Implemented |
GT0780 # 09 Y:2004 | 09 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,453 | $900 | Implemented |
GT0780 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,512 | $0 | Not Implemented |
GT0780 # 07 Y:2004 | 07 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,729 | $1,209 | Implemented |
GT0780 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,772 | $500 | Implemented |
GT0780 # 04 Y:2004 | 04 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $25,046 | $92,125 | Not Implemented |
GT0780 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,654 | $10,261 | Implemented |
GT0780 # 02 Y:2004 | 02 | 2004 | INSTALL TURBULATORS | $11,482 | $12,800 | n/a |
GT0780 # 01 Y:2004 | 01 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,020 | $11,903 | Implemented |
SF0275 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,063 | $739 | Not Implemented |
SF0275 # 02 Y:2004 | 02 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $49,562 | $39,000 | Implemented |
SF0275 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,238 | $0 | Implemented |
SF0275 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,909 | $3,688 | Implemented |
SF0275 # 05 Y:2004 | 05 | 2004 | COVER OPEN TANKS | $715 | $1,469 | Not Implemented |