IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 31152 Ice Cream and Frozen Dessert Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0095 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $305 Not Implemented
UU0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,985 $40,000 Not Implemented
UU0095 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,800 $20,000 Not Implemented
UU0095 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,360 $2,000 Implemented
UU0095 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $7,720 $450 Not Implemented
UU0094 # 05 Y:2005 05 2005 USE OPTIMUM THICKNESS INSULATION $110 $150 Not Implemented
UU0094 # 04 Y:2005 04 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,540 $0 Not Implemented
UU0094 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $220 Not Implemented
UU0094 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,260 $7,000 Not Implemented
UU0094 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $380 Not Implemented
OK0704 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,000 $0 Not Implemented
OK0704 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $1,153 Not Implemented
OK0704 # 09 Y:2005 09 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,463 $13,554 Not Implemented
OK0704 # 08 Y:2005 08 2005 INSTALL SET-BACK TIMERS $1,663 $20 Not Implemented
OK0704 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,769 $11,310 Not Implemented
OK0704 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,011 $2,257 Not Implemented
OK0704 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,912 $8,734 Not Implemented
OK0704 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $820 $688 Not Implemented
OK0704 # 02 Y:2005 02 2005 OPERATE BOILERS ON HIGH FIRE SETTING $4,358 $1,436 Not Implemented
OK0704 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,257 $5,175 Not Implemented
MI0101 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $51,010 $72,500 Not Implemented
MI0101 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,386 $1,030 Implemented
MI0101 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,200 $6,660 Implemented
MI0101 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,336 $600 Not Implemented
MI0101 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,508 $3,000 Not Implemented