IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

577

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0277 # 06 Y:2003 06 2003 REPAIR AND ELIMINATE STEAM LEAKS $40,926 $450 Implemented
WV0277 # 07 Y:2003 07 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $40,046 $1,050 Implemented
WV0277 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $10,739 $62,060 Implemented
WV0277 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,204 $5,175 Implemented
WV0277 # 11 Y:2003 11 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,257 $70 Implemented
WV0272 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $12,184 $721 Implemented
WV0272 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,265 $980 Implemented
WV0272 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $4,369 $621 Implemented
WV0272 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,533 $9,240 Implemented
WV0272 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,209 $1,789 Implemented
WV0272 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,519 $675 Implemented
WV0272 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,390 $200 Implemented
WV0272 # 12 Y:2003 12 2003 USE SYNTHETIC LUBRICANT $1,058 $240 Implemented
WV0272 # 13 Y:2003 13 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $80 Implemented
SU0164 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $115,419 $348,540 Implemented
SU0164 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,096 $55,580 Implemented
SU0164 # 05 Y:2003 05 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,721 $0 Implemented
SU0164 # 07 Y:2003 07 2003 REDESIGN PROCESS $6,861 $270 Implemented
SU0164 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,485 $700 Implemented
SU0164 # 09 Y:2003 09 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $1,293 $955 Implemented
SU0164 # 10 Y:2003 10 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $847 $1,744 Implemented
SU0164 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $723 $608 Implemented
SU0164 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $550 $0 Implemented
SU0164 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $29 Implemented
SF0262 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,464 $5,555 Implemented