IAC Assessment: SU0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product Turkey Products
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 52,000
Annual Production 600,000 Pieces
Production Hrs. Annual 4,250
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,423 2,168,854 kWh $0.07
Electricity Demand $76,685 6,089 kW-months/year $12.59
Electricity Fees $10,972 - $ -
Fuel Oil #2 $48,219 6,491 MMBtu $7.43
Other Gas $9,782 1,253 MMBtu $7.81
TOTAL ENERGY COSTS $300,081
RECOMMENDED SAVINGS* $330,823 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $151,457
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Other Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Other Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
01: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$141,258
Cost:
$1,171,875
$64,081 2,096,364 $77,177 5,955 - - - - - - - - $64,081
2,096,364
kWh
$77,177
5,955
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$115,419
Cost:
$348,540
- - - - - - - - $115,419 14,684 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$115,419
14,684
MMBtu
-
-
$
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$30,000
Cost:
$76,518
- - - - - - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$30,000
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,096
Cost:
$55,580
$13,096 230,256 - - - - - - - - - - $13,096
230,256
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$8,721
Cost:
-
- - - - - - $8,721 1,697 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,721
1,697
MMBtu
-
-
MMBtu
-
-
$
06: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$7,910
Cost:
$10,000
$2,606 37,225 $914 72 $4,390 - - - - - - - $2,606
37,225
kWh
$914
72
kW-months/year
$4,390
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.5194 REDESIGN PROCESS Savings:
$6,861
Cost:
$270
$4,444 63,491 $2,417 191 - - - - - - - - $4,444
63,491
kWh
$2,417
191
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,485
Cost:
$700
- - - - - - $3,485 678 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,485
678
MMBtu
-
-
MMBtu
-
-
$
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,293
Cost:
$955
- - - - - - $1,293 252 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,293
252
MMBtu
-
-
MMBtu
-
-
$
10: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$847
Cost:
$1,744
$619 8,844 $228 18 - - - - - - - - $619
8,844
kWh
$228
18
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$723
Cost:
$608
$530 7,570 $193 15 - - - - - - - - $530
7,570
kWh
$193
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$550
Cost:
-
$440 6,290 $110 9 - - - - - - - - $440
6,290
kWh
$110
9
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$462
Cost:
$29
$462 6,605 - - - - - - - - - - $462
6,605
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
14: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$198
Cost:
$150
$124 1,772 $74 6 - - - - - - - - $124
1,772
kWh
$74
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$330,823
Cost:
$1,666,969
$86,402 2,458,417 $81,113 6,266 $4,390 - $13,499 2,627 $115,419 14,684 $30,000 - $86,402
2,458,417
kWh
$81,113
6,266
kW-months/year
$4,390
-
$
$13,499
2,627
MMBtu
$115,419
14,684
MMBtu
$30,000
-
$
TOTAL IMPLEMENTED Savings:
$151,457
Cost:
$408,426
$19,591 323,056 $2,948 233 - - $13,499 2,627 $115,419 14,684 - - $19,591
323,056
kWh
$2,948
233
kW-months/year
-
-
$
$13,499
2,627
MMBtu
$115,419
14,684
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Other Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Other Gas Personnel Changes