IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,427

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0678 # 06 Y:2013 06 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,240 $1,500 Implemented
IA0507 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,483 $4,993 Implemented
IA0507 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,198 Implemented
IA0507 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $2,933 $2,826 Implemented
IA0507 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $9,686 $7,803 Implemented
IA0507 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,342 $1,000 Implemented
IA0507 # 06 Y:2013 06 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,342 $500 Not Implemented
IA0507 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $792 $650 Implemented
IA0507 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $576 $25 Implemented
IA0507 # 09 Y:2013 09 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,196 $10,318 Implemented
IA0507 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,053 $13,600 Implemented
UD0884 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $9,148 $1,000 Implemented
UD0884 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,605 $19,350 Implemented
UD0884 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,136 $7,000 Implemented
UD0884 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,400 $19,000 Implemented
UD0884 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $936 $500 Implemented
UD0884 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,058 $500 Implemented
UD0884 # 07 Y:2013 07 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,470 $0 Implemented
UD0884 # 08 Y:2013 08 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,876 $0 Implemented
UD0884 # 09 Y:2013 09 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,533 $2,000 Implemented
UD0884 # 10 Y:2013 10 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,365 $11,824 Implemented
UD0884 # 11 Y:2013 11 2013 AVOID FROST FORMATION ON EVAPORATORS $1,417 $0 Implemented
UD0884 # 12 Y:2013 12 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,101 $0 Implemented
UD0880 # 01 Y:2013 01 2013 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $37,553 $100,000 Not Implemented
UD0880 # 02 Y:2013 02 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,784 $5,000 Implemented