Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 3116 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1007 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $21,932 | $0 | Not Implemented |
UD1007 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $924 | $0 | Not Implemented |
UD1007 # 03 Y:2019 | 03 | 2019 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $87,749 | $5,000 | Not Implemented |
UD1007 # 04 Y:2019 | 04 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $80,784 | $10,000 | Not Implemented |
UD1007 # 05 Y:2019 | 05 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,980 | $0 | Implemented |
UD1007 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,566 | $4,400 | Not Implemented |
UD1007 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,535 | $500 | Not Implemented |
UD1007 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,204 | $0 | Implemented |
UD1007 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $1,000 | Not Implemented |
UD1007 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,710 | $34,800 | Not Implemented |
UD1007 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,235 | $23,550 | Implemented |
OK1020 # 01 Y:2019 | 01 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $164,531 | $0 | Not Implemented |
OK1020 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $91,270 | $50,570 | Not Implemented |
OK1020 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111,877 | $100,000 | Not Implemented |
OK1020 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $84,978 | $73,560 | Not Implemented |
OK1020 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,536 | $500 | Not Implemented |
OK1020 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,990 | $0 | Not Implemented |
OK1020 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,410 | $1,270 | Not Implemented |
NL0039 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $36,367 | $39,000 | Implemented |
NL0039 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $15,324 | $44 | Implemented |
NL0039 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,128 | $2,497 | Implemented |
NL0039 # 04 Y:2019 | 04 | 2019 | MINIMIZE WATER USAGE | $10,832 | $1,127 | Implemented |
NL0039 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,739 | $1,600 | Implemented |
NC0639 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,819 | $1,000 | Not Implemented |
NC0639 # 02 Y:2019 | 02 | 2019 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,196 | $8,200 | Not Implemented |