IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 3116 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0420 # 10 Y:2023 10 2023 PAY UTILITY BILLS ON TIME $111 $0 Implemented
MI0420 # 09 Y:2023 09 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,456 $280 Implemented
MI0420 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,784 $3,190 Not Implemented
MI0420 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,017 $86,104 Not Implemented
MI0420 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $65,480 $580 Implemented
MI0420 # 02 Y:2023 02 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $25,315 $1,760 Not Implemented
MI0420 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,929 $163,200 Not Implemented
MI0420 # 04 Y:2023 04 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,620 $52,100 Implemented
MI0420 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $15,797 $0 Implemented
MI0420 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,309 $1,980 Implemented
MI0147 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,498 $1,750 Implemented
MI0147 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $30 Not Implemented
MI0147 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,950 $1,074 Not Implemented
MI0147 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,305 $7,878 Implemented
MI0147 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,581 $16,000 Implemented
UF0384 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,070 Not Implemented
UF0384 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $25,292 $72,945 Not Implemented
UF0384 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $117 $0 Not Implemented
UF0384 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,822 $3,057 Not Implemented
UF0384 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,026 $0 Not Implemented
UF0384 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $2,569 $2,053 Not Implemented
UF0384 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,524 $408 Not Implemented
UF0384 # 07 Y:2006 07 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,857 $575 Not Implemented
UF0384 # 09 Y:2006 09 2006 INCREASE EFFICIENCY OF TRUCKS $2,312 $0 Not Implemented
UF0345 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,479 $18,128 Implemented