IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
NAICS 31161 Animal Slaughtering and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1210 # 09 Y:2012 09 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,708 $100 Not Implemented
UK1210 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,568 $12,500 Not Implemented
UK1210 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,955 $5,000 Not Implemented
UK1210 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,598 $2,240 Not Implemented
UK1210 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,202 $500 Not Implemented
UK1210 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,591 $1,000 Not Implemented
UK1210 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $521 $180 Not Implemented
UK1210 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $52,633 $52,000 Not Implemented
UD0797 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $141,216 $250,000 Not Implemented
UD0797 # 02 Y:2009 02 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $61,511 $5,000 Not Implemented
UD0797 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,489 $48,750 Implemented
UD0797 # 09 Y:2009 09 2009 DISCONNECT BALLASTS $858 $0 Implemented
UD0797 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,395 $6,000 Not Implemented
UD0797 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $23,393 $75,000 Not Implemented
UD0797 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,034 $1,000 Implemented
UD0797 # 07 Y:2009 07 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,835 $75,000 Not Implemented
UD0797 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $4,088 $3,150 Not Implemented
TT0013 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,555 $60,943 Not Implemented
TT0013 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,523 $88,373 Not Implemented
TT0013 # 03 Y:2007 03 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $235,000 $425,000 Not Implemented
TT0013 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,410 $10,550 Not Implemented
TT0013 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $60,000 $180,000 Not Implemented
TT0009 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,792 $12,144 Not Implemented
TT0009 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $537 Not Implemented
TT0009 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,335 $8,476 Not Implemented