Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
206
matching recommendationsNAICS | 311612 | Meat Processed from Carcasses |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2501 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $71,253 | $442,396 | Implemented |
LS2501 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,529 | $0 | Implemented |
LS2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $90 | Implemented |
LE0551 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $69,768 | $5,000 | Implemented |
LE0551 # 03 Y:2023 | 03 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $111,339 | $525,000 | Implemented |
NL0075 # 04 Y:2022 | 04 | 2022 | INSULATE BARE EQUIPMENT | $980 | $404 | Implemented |
NL0075 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,087 | $1,652 | Implemented |
NL0075 # 01 Y:2022 | 01 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $13,412 | $7,500 | Implemented |
OK1082 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,847 | $323 | Implemented |
OK1082 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,475 | $36,319 | Implemented |
OK1082 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,649 | $2,715 | Implemented |
OK1082 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,804 | $14,599 | Implemented |
NL0064 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $204 | $130 | Implemented |
NL0064 # 05 Y:2022 | 05 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $331 | $90 | Implemented |
NL0064 # 04 Y:2022 | 04 | 2022 | USE HIGH PRESSURE WASH SYSTEMS | $768 | $240 | Implemented |
NL0064 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,248 | $2,875 | Implemented |
NL0064 # 01 Y:2022 | 01 | 2022 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $79,442 | $292,000 | Implemented |
NL0064 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,251 | $1,729 | Implemented |
SF0573 # 03 Y:2021 | 03 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $514 | $105 | Implemented |
SF0573 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,133 | $0 | Implemented |
SF0573 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $718 | $0 | Implemented |
SF0573 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,800 | $266,176 | Implemented |
SF0573 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,292 | $4,273 | Implemented |
LE0508 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,328 | $100 | Implemented |
LE0508 # 05 Y:2021 | 05 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,407 | $24,000 | Implemented |