IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
NAICS 311612 Meat Processed from Carcasses
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0866 # 09 Y:2012 09 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $583 $1,300 Not Implemented
UD0866 # 10 Y:2012 10 2012 USE MINIMUM STEAM OPERATING PRESSURE $83,103 $83,103 Implemented
UD0866 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $28,807 $0 Implemented
UD0866 # 12 Y:2012 12 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,878 $20,000 Not Implemented
UD0866 # 13 Y:2012 13 2012 USE MINIMUM STEAM OPERATING PRESSURE $10,985 $32,955 Not Implemented
UD0866 # 14 Y:2012 14 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,212 $8,000 Not Implemented
UD0866 # 15 Y:2012 15 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $9,098 $10,982 Implemented
UD0866 # 16 Y:2012 16 2012 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,283 $15,600 Not Implemented
OK0811 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $127,513 $58,126 Not Implemented
OK0811 # 02 Y:2011 02 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,432 $60,934 Not Implemented
OK0811 # 03 Y:2011 03 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,854 $2,600 Implemented
OK0811 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,132 $60,156 Not Implemented
OK0811 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,716 $11,429 Not Implemented
OK0811 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $160 $944 Implemented
OK0811 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $32,372 $270,346 Not Implemented
OK0811 # 08 Y:2011 08 2011 MINIMIZE WATER USAGE $159,930 $46,397 Not Implemented
OK0811 # 09 Y:2011 09 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $61,620 $459 Not Implemented
OK0811 # 10 Y:2011 10 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $22,682 $0 Implemented
GT0880 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,831 $1,250 Implemented
GT0880 # 02 Y:2011 02 2011 USE SYNTHETIC LUBRICANT $13,152 $0 Not Implemented
GT0880 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,390 $244 Not Implemented
GT0880 # 04 Y:2011 04 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $75,872 $100,115 Implemented
GT0880 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $70,097 $17,000 Implemented
GT0880 # 06 Y:2011 06 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,994 $5,000 Not Implemented
GT0880 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,232 $38,000 Not Implemented