IAC logo
IAC Assessment: IA0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2014
Principal Product Bacon
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 420
Plant Area (Sq.Ft.) 85,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,037,055 26,140,065 kWh $0.04
Electricity Demand $768,848 63,621 kW-months/year $12.08
Electricity Fees $19,135 - $ -
Natural Gas $218,953 35,343 MMBtu $6.20
TOTAL ENERGY COSTS $2,043,991
RECOMMENDED SAVINGS* $47,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,810
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$42,230
Cost:
$125,850
$28,299 718,250 $13,931 1,152 $28,299
718,250
kWh
$13,931
1,152
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,013
Cost:
$35
$679 17,222 $334 28 $679
17,222
kWh
$334
28
kW-months/year
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,851
Cost:
$8,742
$1,098 27,825 $753 62 $1,098
27,825
kWh
$753
62
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,390
Cost:
$5,334
$1,390 35,303 - - $1,390
35,303
kWh
-
-
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$540
Cost:
$1,680
$540 13,723 - - $540
13,723
kWh
-
-
kW-months/year
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$189
Cost:
$100
$189 4,800 - - $189
4,800
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$47,213
Cost:
$141,741
$32,195 817,123 $15,018 1,242 $32,195
817,123
kWh
$15,018
1,242
kW-months/year
TOTAL IMPLEMENTED Savings:
$44,810
Cost:
$136,372
$30,126 764,598 $14,684 1,214 $30,126
764,598
kWh
$14,684
1,214
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand