IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
NAICS 311613 Rendering and Meat Byproduct Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0880 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $12,462 $0 Implemented
UD0880 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,120 $1,000 Implemented
UD0880 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $35,463 $15,000 Implemented
UD0880 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $25,120 $4,600 Implemented
UD0880 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,091 $25,000 Implemented
UD0880 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,315 $8,000 Implemented
UD0880 # 12 Y:2013 12 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,170 $8,000 Implemented
UD0880 # 13 Y:2013 13 2013 INSULATE BARE EQUIPMENT $3,572 $1,221 Implemented
UD0880 # 14 Y:2013 14 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,352 $0 Implemented
UD0880 # 15 Y:2013 15 2013 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $6,830 $0 Implemented
MS0353 # 01 Y:2010 01 2010 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,522,531 $8,282,000 Not Implemented
MS0353 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,831 $57,360 Implemented
MS0353 # 03 Y:2010 03 2010 REPAIR AND ELIMINATE STEAM LEAKS $19,240 $312 Implemented
MS0353 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,131 $322 Implemented
MS0353 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,266 $1,050 Not Implemented
MI0169 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $79,083 $3,320 Implemented
MI0169 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,749 $1,210 Implemented
MI0169 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,089 $3,928 Not Implemented
MI0169 # 04 Y:2008 04 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,803 $18,301 Not Implemented
MI0169 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,967 $40 Not Implemented
MI0169 # 06 Y:2008 06 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,528 $1,240 Not Implemented
GT0851 # 01 Y:2008 01 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $48,953 $8,350 Not Implemented
GT0851 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,800 $0 Not Implemented
GT0851 # 03 Y:2008 03 2008 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $15,410 $0 Not Implemented
GT0851 # 04 Y:2008 04 2008 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $18,784 $450 Not Implemented