Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 311613 | Rendering and Meat Byproduct Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0301 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,705 | $17,952 | Not Implemented |
SF0301 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,296 | $3,276 | Not Implemented |
SF0301 # 07 Y:2005 | 07 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $738 | $1,086 | Not Implemented |
SF0301 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,905 | $2,148 | Not Implemented |
SF0301 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $524 | $492 | Not Implemented |
SF0301 # 04 Y:2005 | 04 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $11,812 | $1,220 | Not Implemented |
SF0301 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $819 | $0 | Not Implemented |
SF0301 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $0 | Not Implemented |
SF0301 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,466 | $0 | Not Implemented |
SF0262 # 10 Y:2003 | 10 | 2003 | RECOVER AND REUSE COOLING WATER | $4,190 | $6,871 | Not Implemented |
SF0262 # 01 Y:2003 | 01 | 2003 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $144,108 | $26,738 | Not Implemented |
SF0262 # 09 Y:2003 | 09 | 2003 | REPLACE BOILER | $39,608 | $155,089 | Not Implemented |
SF0262 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,502 | $19,608 | Not Implemented |
SF0262 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $2,530 | $3,638 | Implemented |
SF0262 # 06 Y:2003 | 06 | 2003 | USE PHOTOCELL CONTROLS | $355 | $360 | Not Implemented |
SF0262 # 05 Y:2003 | 05 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,013 | $2,748 | Implemented |
SF0262 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,464 | $5,555 | Implemented |
SF0262 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,281 | $564 | Not Implemented |
SF0262 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $1,596 | $619 | Not Implemented |