IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0075 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,700 $8,000 Not Implemented
UU0075 # 01 Y:2004 01 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $400 $250 Not Implemented
UU0075 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,590 $1,320 Implemented
UU0075 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $980 $4,500 Not Implemented
UU0075 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,120 $150 Implemented
UU0075 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,270 $1,000 Implemented
UU0075 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,540 $8,000 Not Implemented
CO0557 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $3,060 $4,520 Not Implemented
CO0557 # 08 Y:2004 08 2004 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $910 $5,730 Not Implemented
CO0557 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $1,380 Not Implemented
CO0557 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,344 $508 Not Implemented
CO0557 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $4,690 Not Implemented
CO0557 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $950 Not Implemented
CO0557 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $718 $876 Implemented
CO0557 # 01 Y:2004 01 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $20,790 $33,000 Not Implemented
WV0301 # 09 Y:2004 09 2004 BURN WASTE OIL FOR HEAT $1,799 $3,800 Not Implemented
WV0301 # 07 Y:2004 07 2004 REPAIR OR REPLACE STEAM TRAPS $3,558 $1,000 Implemented
WV0301 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,918 $4,120 Implemented
WV0301 # 04 Y:2004 04 2004 DEVELOP A REPAIR/REPLACE POLICY $6,476 $360 Implemented
WV0301 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $30,817 $4,062 Implemented
WV0301 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,529 $14,877 Implemented
WV0301 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,898 $780 Not Implemented
WV0301 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,925 $120 Implemented
WV0301 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,362 $175 Implemented
WV0301 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,088 $1,890 Implemented