IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 3118 Bakeries and Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0366 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $81,321 $400,000 Not Implemented
NC0366 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $61,491 $250,000 Not Implemented
NC0366 # 03 Y:2007 03 2007 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $18,013 $60,000 Not Implemented
NC0366 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $71,297 $280,000 Implemented
NC0366 # 05 Y:2007 05 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $12,430 $12,000 Implemented
MI0153 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $628 $2,610 Not Implemented
MI0153 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,348 $1,074 Not Implemented
MI0153 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,256 $260 Not Implemented
MI0153 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,866 $54,000 Not Implemented
MI0153 # 01 Y:2007 01 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $342,569 $290,000 Not Implemented
SF0343 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $364 Implemented
SF0343 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $6,925 $6,063 Implemented
SF0343 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,009 $9,569 Implemented
SF0343 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,112 $220 Implemented
SF0342 # 08 Y:2007 08 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $130,413 $250,000 Not Implemented
SF0342 # 07 Y:2007 07 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,176 $22,780 Implemented
SF0342 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,282 $34,413 Not Implemented
SF0342 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $17,040 $25,438 Not Implemented
SF0342 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,746 $7,500 Implemented
SF0342 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,412 Not Implemented
SF0342 # 02 Y:2007 02 2007 AVOID FROST FORMATION ON EVAPORATORS $86,147 $41,628 Not Implemented
SF0342 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $250,944 $80,000 Not Implemented
SF0342 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,677 $54,912 Implemented
SF0342 # 11 Y:2007 11 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $1,536 $5,000 Not Implemented
SF0342 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,865 $13,500 Not Implemented