Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
442
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2417 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $5,554 | $1,050 | n/a |
UC2417 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,301 | $75 | n/a |
UC2417 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,329 | $0 | n/a |
UC2417 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,989 | $7,146 | n/a |
UC2417 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $888 | $0 | n/a |
UC2417 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,644 | $9,173 | n/a |
SJ0026 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $123,957 | $18,405 | n/a |
SJ0026 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $0 | n/a |
SJ0026 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $653 | $607 | n/a |
SJ0026 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,978 | $9,706 | n/a |
SJ0026 # 09 Y:2024 | 09 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,261 | $1,017 | n/a |
SJ0026 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,177 | $9,200 | n/a |
SJ0026 # 10 Y:2024 | 10 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $706 | $1,151 | n/a |
SJ0026 # 08 Y:2024 | 08 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $4,132 | $25,650 | n/a |
SJ0026 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $79,569 | $266,719 | n/a |
SJ0026 # 03 Y:2024 | 03 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,192 | $888 | n/a |
TT0310 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $6,590 | $2,200 | n/a |
TT0310 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,068 | $12,500 | n/a |
TT0310 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,939 | $3,600 | n/a |
TT0310 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $75 | n/a |
TT0310 # 02 Y:2024 | 02 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,414 | $17,000 | n/a |
TT0310 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,227 | $9,500 | n/a |
TT0310 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,799 | $60 | n/a |
MI0440 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $211,950 | $698,434 | Not Implemented |
MI0440 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,169 | $1,320 | Implemented |