IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0274 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,582 $6,871 Implemented
MI0274 # 10 Y:2015 10 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,145 $780 Implemented
MI0274 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $626 $360 Implemented
MI0274 # 12 Y:2015 12 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $457 $160 Implemented
MI0274 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $320 $310 Not Implemented
MI0274 # 14 Y:2015 14 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $253 $320 Implemented
UF0444 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,948 $19,732 Implemented
UF0444 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $19,284 $813 Implemented
UF0444 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,401 $404 Implemented
UF0444 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,428 $25,300 Not Implemented
UF0444 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,135 $1,000 Implemented
UF0444 # 06 Y:2011 06 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,175 $4,385 Not Implemented
UF0444 # 07 Y:2011 07 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,862 $2,729 Not Implemented
UF0444 # 08 Y:2011 08 2011 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $14,978 $39,066 Not Implemented
UF0444 # 09 Y:2011 09 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $616 $0 Not Implemented
UF0444 # 10 Y:2011 10 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,606 $930 Not Implemented
UF0444 # 11 Y:2011 11 2011 COVER OPEN TANKS $9,431 $2,321 Not Implemented
UF0444 # 12 Y:2011 12 2011 INSTALL TURBULATORS $16,282 $7,500 Not Implemented
MI0183 # 01 Y:2009 01 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,088 $1,360 Implemented
MI0183 # 02 Y:2009 02 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,816 $1,280 Not Implemented
MI0183 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,012 $1,200 Not Implemented
MI0183 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,501 $2,320 Not Implemented
MI0183 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,481 $320 Implemented
MI0183 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,750 $1,500 Implemented
MI0183 # 07 Y:2009 07 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $198 $180 Not Implemented