Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
121
matching recommendationsNAICS | 31181 | Bread and Bakery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0274 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,582 | $6,871 | Implemented |
MI0274 # 10 Y:2015 | 10 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,145 | $780 | Implemented |
MI0274 # 11 Y:2015 | 11 | 2015 | USE OPTIMUM THICKNESS INSULATION | $626 | $360 | Implemented |
MI0274 # 12 Y:2015 | 12 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $457 | $160 | Implemented |
MI0274 # 13 Y:2015 | 13 | 2015 | INSULATE BARE EQUIPMENT | $320 | $310 | Not Implemented |
MI0274 # 14 Y:2015 | 14 | 2015 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $253 | $320 | Implemented |
UF0444 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,948 | $19,732 | Implemented |
UF0444 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $19,284 | $813 | Implemented |
UF0444 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,401 | $404 | Implemented |
UF0444 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,428 | $25,300 | Not Implemented |
UF0444 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,135 | $1,000 | Implemented |
UF0444 # 06 Y:2011 | 06 | 2011 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,175 | $4,385 | Not Implemented |
UF0444 # 07 Y:2011 | 07 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,862 | $2,729 | Not Implemented |
UF0444 # 08 Y:2011 | 08 | 2011 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $14,978 | $39,066 | Not Implemented |
UF0444 # 09 Y:2011 | 09 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $616 | $0 | Not Implemented |
UF0444 # 10 Y:2011 | 10 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,606 | $930 | Not Implemented |
UF0444 # 11 Y:2011 | 11 | 2011 | COVER OPEN TANKS | $9,431 | $2,321 | Not Implemented |
UF0444 # 12 Y:2011 | 12 | 2011 | INSTALL TURBULATORS | $16,282 | $7,500 | Not Implemented |
MI0183 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,088 | $1,360 | Implemented |
MI0183 # 02 Y:2009 | 02 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,816 | $1,280 | Not Implemented |
MI0183 # 03 Y:2009 | 03 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,012 | $1,200 | Not Implemented |
MI0183 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,501 | $2,320 | Not Implemented |
MI0183 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,481 | $320 | Implemented |
MI0183 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,750 | $1,500 | Implemented |
MI0183 # 07 Y:2009 | 07 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $198 | $180 | Not Implemented |