IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
NAICS 31181 Bread and Bakery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0183 # 08 Y:2009 08 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $133 $60 Implemented
MI0143 # 01 Y:2007 01 2007 HEAT WATER WITH EXHAUST HEAT $144,259 $23,000 Not Implemented
MI0143 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,797 $1,074 Not Implemented
MI0143 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,665 $30 Not Implemented
MI0143 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,791 $3,906 Not Implemented
MI0143 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,100 $375 Not Implemented
MI0143 # 06 Y:2007 06 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,056 $1,418 Not Implemented
MI0143 # 07 Y:2007 07 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,826 $3,400 Not Implemented
MI0134 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99,039 $135,000 Implemented
MI0134 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $45,221 $10,000 Not Implemented
MI0134 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $45,075 $16,854 Not Implemented
MI0134 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,182 $964 Implemented
MI0134 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,015 $780 Not Implemented
MI0134 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,709 $30 Implemented
MI0128 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $78,238 $4,445 Not Implemented
MI0128 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $19,974 $5,000 Not Implemented
MI0128 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,372 $31,540 Implemented
MI0128 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,248 $1,750 Not Implemented
MI0128 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,703 $1,074 Implemented
MI0128 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,762 $4,800 Not Implemented
MI0128 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $30 Implemented