Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,036
matching recommendationsNAICS | 311812 | Commercial Bakeries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0376 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $3,381 | $11,736 | Implemented |
LE0376 # 10 Y:2014 | 10 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $42,779 | $169,000 | Not Implemented |
LE0376 # 11 Y:2014 | 11 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,052 | $20,066 | Implemented |
MZ0141 # 01 Y:2014 | 01 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,625 | $7,000 | Implemented |
MZ0141 # 02 Y:2014 | 02 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $12,947 | $24,000 | Not Implemented |
MZ0141 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,254 | $11,500 | Not Implemented |
MZ0141 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,000 | $6,000 | Not Implemented |
MZ0141 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,440 | $2,500 | Not Implemented |
MZ0141 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,518 | $21,850 | Implemented |
MZ0141 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $10,446 | $1,875 | Not Implemented |
MZ0141 # 08 Y:2014 | 08 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,940 | $0 | Implemented |
AM0660 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,580 | $10,000 | Not Implemented |
AM0660 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,185 | $9,543 | Implemented |
AM0660 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,765 | $10 | Implemented |
AM0660 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $1,560 | $2,425 | Not Implemented |
AM0660 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,560 | $855 | Implemented |
AM0660 # 06 Y:2014 | 06 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,260 | $0 | Not Implemented |
AM0660 # 07 Y:2014 | 07 | 2014 | USE SYNTHETIC LUBRICANT | $1,080 | $0 | Implemented |
AM0660 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $660 | Implemented |
AM0660 # 09 Y:2014 | 09 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $940 | $405 | Implemented |
AM0660 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $115 | $135 | Not Implemented |
UD0903 # 01 Y:2014 | 01 | 2014 | COMBINE UTILITY METERS | $4,811 | $0 | Implemented |
UD0903 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,853 | $0 | Implemented |
UD0903 # 03 Y:2014 | 03 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $847 | $0 | Implemented |
UD0903 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $137 | $0 | Not Implemented |