IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 311812 Commercial Bakeries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0153 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $628 $2,610 Not Implemented
MI0153 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,348 $1,074 Not Implemented
MI0153 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,256 $260 Not Implemented
MI0153 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,866 $54,000 Not Implemented
MI0153 # 01 Y:2007 01 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $342,569 $290,000 Not Implemented
SF0343 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,009 $9,569 Implemented
SF0343 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $364 Implemented
SF0343 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $6,925 $6,063 Implemented
SF0343 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,112 $220 Implemented
AM0529 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $41,500 $86,400 Implemented
AM0529 # 08 Y:2007 08 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $968 $0 Implemented
AM0529 # 07 Y:2007 07 2007 USE SYNTHETIC LUBRICANT $2,027 $0 Not Implemented
AM0529 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $360 Implemented
AM0529 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,110 $2,165 Implemented
AM0529 # 04 Y:2007 04 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $3,210 $52,600 Not Implemented
AM0529 # 03 Y:2007 03 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $18,360 $8,240 Not Implemented
AM0529 # 01 Y:2007 01 2007 INSTALL HYDROGEN FUEL CELL $59,020 $250,000 Not Implemented
MI0143 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,665 $30 Not Implemented
MI0143 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,791 $3,906 Not Implemented
MI0143 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,100 $375 Not Implemented
MI0143 # 06 Y:2007 06 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,056 $1,418 Not Implemented
MI0143 # 07 Y:2007 07 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,826 $3,400 Not Implemented
MI0143 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,797 $1,074 Not Implemented
MI0143 # 01 Y:2007 01 2007 HEAT WATER WITH EXHAUST HEAT $144,259 $23,000 Not Implemented