Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 311812 | Commercial Bakeries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0641 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $581 | $1,121 | Implemented |
OR0641 # 04 Y:2014 | 04 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,470 | $1,577 | Implemented |
OR0641 # 03 Y:2014 | 03 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,509 | $8,500 | Not Implemented |
OR0641 # 02 Y:2014 | 02 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,580 | $8,760 | Implemented |
OR0641 # 01 Y:2014 | 01 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,076 | $2,794 | Implemented |
AM0668 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,840 | $33,524 | Implemented |
AM0668 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,110 | $0 | Implemented |
AM0668 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,820 | $9 | Not Implemented |
AM0668 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,250 | $2,500 | Implemented |
AM0668 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,700 | $3,340 | Not Implemented |
AM0668 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $450 | $60 | Not Implemented |
CO0695 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $640 | $1,540 | Not Implemented |
CO0695 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,330 | $3,000 | Implemented |
CO0695 # 03 Y:2014 | 03 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $20,810 | $50 | Implemented |
CO0695 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,250 | $23,365 | Implemented |
LE0376 # 03 Y:2014 | 03 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,711 | $3,192 | Not Implemented |
LE0376 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $3,381 | $11,736 | Implemented |
LE0376 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,345 | $17,700 | Implemented |
LE0376 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,223 | $1,830 | Not Implemented |
LE0376 # 06 Y:2014 | 06 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,081 | $10,500 | Implemented |
LE0376 # 05 Y:2014 | 05 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $2,157 | $1,170 | Implemented |
LE0376 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,614 | $673 | Not Implemented |
LE0376 # 02 Y:2014 | 02 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,341 | $2,500 | Not Implemented |
LE0376 # 11 Y:2014 | 11 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,052 | $20,066 | Implemented |
LE0376 # 10 Y:2014 | 10 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $42,779 | $169,000 | Not Implemented |