IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
NAICS 311813 Frozen Cakes, Pies, and Other Pastries Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0133 # 05 Y:2020 05 2020 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,196 $4,991 Not Implemented
IP0133 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $618 $553 Not Implemented
IP0133 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,033 $14,189 Not Implemented
IP0133 # 02 Y:2020 02 2020 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,073 $1,218 Not Implemented
IP0133 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $1,574 $343 Not Implemented
OK0988 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,279 $15,642 Not Implemented
OK0988 # 04 Y:2018 04 2018 USE SOLAR HEAT TO HEAT WATER $4,920 $155,149 Not Implemented
OK0988 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $2,330 Not Implemented
OK0988 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $7,394 $12,000 Not Implemented
SU0461 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,315 $0 Not Implemented
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,138 $700 Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
SU0461 # 05 Y:2018 05 2018 REPLACE BOILER $10,937 $22,000 Not Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
SU0461 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $910 $651 Not Implemented
BS0068 # 03 Y:2015 03 2015 AIR CONDITION ONLY SPACE NECESSARY $1,060 $4,455 Not Implemented
BS0068 # 04 Y:2015 04 2015 USE OPTIMUM THICKNESS INSULATION $29 $100 Not Implemented
BS0068 # 05 Y:2015 05 2015 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $12,480 $11,240 Not Implemented
BS0068 # 02 Y:2015 02 2015 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,272 $5,853 Not Implemented
BS0068 # 01 Y:2015 01 2015 USE OPTIMUM THICKNESS INSULATION $70 $51 Not Implemented
MZ0156 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,886 $4,400 Implemented
MZ0156 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $9,068 $30,128 Implemented
MZ0156 # 08 Y:2014 08 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,299 $10,282 Implemented
MZ0156 # 06 Y:2014 06 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,337 $676 Not Implemented