IAC logo
IAC Assessment: SU0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2018
Principal Product Frozen Desserts
NAICS 311813 - Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 52,500
Annual Production 568,881 Units
Production Hrs. Annual 4,290
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,523 2,823,103 kWh $0.04
Electricity Demand $62,745 6,840 kW-months/year $9.17
Electricity Fees $273 - $ -
Natural Gas $63,590 12,816 MMBtu $4.96
TOTAL ENERGY COSTS $244,131
RECOMMENDED SAVINGS* $29,527 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,365
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,315
Cost:
-
$2,553 60,799 - - - - $(-188) - $(-50) - $2,553
60,799
kWh
-
-
kW-months/year
-
-
MMBtu
$(-188)
-
$
$(-50)
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,138
Cost:
$700
- - $3,138 342 - - - - - - -
-
kWh
$3,138
342
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$910
Cost:
$651
$910 21,676 - - - - - - - - $910
21,676
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$272
Cost:
$397
$129 3,066 $39 4 - - $75 - $29 - $129
3,066
kWh
$39
4
kW-months/year
-
-
MMBtu
$75
-
$
$29
-
$
05: 2.1224 REPLACE BOILER Savings:
$10,937
Cost:
$22,000
- - - - $10,937 2,205 - - - - -
-
kWh
-
-
kW-months/year
$10,937
2,205
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,640
Cost:
$27,679
$7,394 176,046 $4,826 526 - - $220 - $(-800) - $7,394
176,046
kWh
$4,826
526
kW-months/year
-
-
MMBtu
$220
-
$
$(-800)
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$315
Cost:
$955
$315 7,491 - - - - - - - - $315
7,491
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,527
Cost:
$52,382
$11,301 269,078 $8,003 872 $10,937 2,205 $107 - $(-821) - $11,301
269,078
kWh
$8,003
872
kW-months/year
$10,937
2,205
MMBtu
$107
-
$
$(-821)
-
$
TOTAL IMPLEMENTED Savings:
$15,365
Cost:
$29,731
$7,838 186,603 $8,003 872 - - $295 - $(-771) - $7,838
186,603
kWh
$8,003
872
kW-months/year
-
-
MMBtu
$295
-
$
$(-771)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost