IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
NAICS 311813 Frozen Cakes, Pies, and Other Pastries Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0156 # 03 Y:2014 03 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,460 $400 Implemented
MZ0156 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,886 $4,400 Implemented
MZ0156 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $9,068 $30,128 Implemented
MZ0156 # 06 Y:2014 06 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,337 $676 Not Implemented
OK0866 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $232 $280 Implemented
OK0866 # 10 Y:2013 10 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $1,019 $700 Not Implemented
OK0866 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $1,077 $16,000 Implemented
OK0866 # 13 Y:2013 13 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $189 $2,098 Not Implemented
OK0866 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,259 $28,400 Not Implemented
OK0866 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $3,992 Not Implemented
OK0866 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,915 $2,598 Not Implemented
OK0866 # 12 Y:2013 12 2013 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,408 $2,686 Not Implemented
OK0866 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $299 $463 Not Implemented
OK0866 # 03 Y:2013 03 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,312 $184,080 Not Implemented
OK0866 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,260 $28,000 Not Implemented
OK0866 # 05 Y:2013 05 2013 INSTALL SET-BACK TIMERS $449 $318 Implemented
OK0866 # 04 Y:2013 04 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,776 $1,440 Implemented
OK0866 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,853 $22,216 Not Implemented
SF0342 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,865 $13,500 Not Implemented
SF0342 # 02 Y:2007 02 2007 AVOID FROST FORMATION ON EVAPORATORS $86,147 $41,628 Not Implemented
SF0342 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,412 Not Implemented
SF0342 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,746 $7,500 Implemented
SF0342 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $17,040 $25,438 Not Implemented
SF0342 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,282 $34,413 Not Implemented
SF0342 # 08 Y:2007 08 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $130,413 $250,000 Not Implemented