Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
70
matching recommendationsNAICS | 311813 | Frozen Cakes, Pies, and Other Pastries Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0866 # 10 Y:2013 | 10 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,019 | $700 | Not Implemented |
OK0866 # 14 Y:2013 | 14 | 2013 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,077 | $16,000 | Implemented |
OK0866 # 13 Y:2013 | 13 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $189 | $2,098 | Not Implemented |
OK0866 # 12 Y:2013 | 12 | 2013 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $2,408 | $2,686 | Not Implemented |
OK0866 # 11 Y:2013 | 11 | 2013 | INSULATE BARE EQUIPMENT | $232 | $280 | Implemented |
OK0866 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $865 | $3,992 | Not Implemented |
OK0866 # 04 Y:2013 | 04 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,776 | $1,440 | Implemented |
OK0866 # 02 Y:2013 | 02 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,259 | $28,400 | Not Implemented |
OK0866 # 03 Y:2013 | 03 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $19,312 | $184,080 | Not Implemented |
OK0866 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,915 | $2,598 | Not Implemented |
OK0866 # 01 Y:2013 | 01 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,260 | $28,000 | Not Implemented |
OK0866 # 05 Y:2013 | 05 | 2013 | INSTALL SET-BACK TIMERS | $449 | $318 | Implemented |
OK0866 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $299 | $463 | Not Implemented |
OK0866 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,853 | $22,216 | Not Implemented |
SF0342 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,598 | $1,412 | Not Implemented |
SF0342 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $250,944 | $80,000 | Not Implemented |
SF0342 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,746 | $7,500 | Implemented |
SF0342 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,865 | $13,500 | Not Implemented |
SF0342 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,677 | $54,912 | Implemented |
SF0342 # 11 Y:2007 | 11 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,536 | $5,000 | Not Implemented |
SF0342 # 07 Y:2007 | 07 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,176 | $22,780 | Implemented |
SF0342 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $17,040 | $25,438 | Not Implemented |
SF0342 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,282 | $34,413 | Not Implemented |
SF0342 # 02 Y:2007 | 02 | 2007 | AVOID FROST FORMATION ON EVAPORATORS | $86,147 | $41,628 | Not Implemented |
SF0342 # 08 Y:2007 | 08 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $130,413 | $250,000 | Not Implemented |