Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsNAICS | 311824 | Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0026 # 09 Y:2024 | 09 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,261 | $1,017 | n/a |
SJ0026 # 10 Y:2024 | 10 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $706 | $1,151 | n/a |
SJ0026 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $0 | n/a |
SJ0026 # 08 Y:2024 | 08 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $4,132 | $25,650 | n/a |
SJ0026 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,177 | $9,200 | n/a |
SJ0026 # 03 Y:2024 | 03 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,192 | $888 | n/a |
SJ0026 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $123,957 | $18,405 | n/a |
SJ0026 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $79,569 | $266,719 | n/a |
SJ0026 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $653 | $607 | n/a |
SJ0026 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,978 | $9,706 | n/a |
MU0035 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,539 | $0 | Not Implemented |
MU0035 # 02 Y:2023 | 02 | 2023 | KEEP EQUIPMENT CLEAN | $216 | $0 | Not Implemented |
MU0035 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,081 | $374 | Not Implemented |
MU0035 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,453 | $5,164 | Not Implemented |
MU0035 # 05 Y:2023 | 05 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $934 | $0 | Not Implemented |
MU0035 # 06 Y:2023 | 06 | 2023 | ELIMINATE/REDUCE AN OPERATION | $13,378 | $0 | Not Implemented |
UW2303 # 05 Y:2023 | 05 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $199 | $282 | Not Implemented |
UW2303 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $590 | $124 | Not Implemented |
UW2303 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $687 | $1,488 | Not Implemented |
UW2303 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,161 | $624 | Not Implemented |
UW2303 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,084 | $5,025 | Not Implemented |
UW2303 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $702 | $959 | Not Implemented |
CM1016 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $44,187 | $184,569 | n/a |
CM1016 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,413 | $6,724 | n/a |
CM1016 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,957 | $0 | n/a |