IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 31183 Tortilla Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0013 # 09 Y:2024 09 2024 COMBINE UTILITY METERS $454 $0 Not Implemented
SJ0013 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,399 $1,473 Not Implemented
SJ0013 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $22 Not Implemented
SJ0013 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,579 $0 Not Implemented
SJ0013 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $733 $0 Not Implemented
SJ0013 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,556 $4,600 Not Implemented
SJ0013 # 03 Y:2024 03 2024 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28 $235 Not Implemented
SJ0013 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,372 $104 Not Implemented
SJ0013 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,814 $107,262 Not Implemented
SD0465 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,606 $29,550 Not Implemented
SD0465 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $402 $1,100 Not Implemented
SD0465 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,113 $200 Not Implemented
SD0465 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,318 $1,521 Not Implemented
SD0465 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $200 Implemented
SD0465 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,054 $2,000 Implemented
SD0465 # 01 Y:2013 01 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $18,166 $60,710 Not Implemented
SF0355 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $282 $1,174 Implemented
SF0355 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $422 $4,836 Not Implemented
SF0355 # 06 Y:2008 06 2008 SELL OIL TO RECYCLER $13,000 $0 Not Implemented
SF0355 # 07 Y:2008 07 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $210 $0 Not Implemented
SF0355 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $25,511 $50,000 Not Implemented
SF0355 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,950 $26,488 Implemented
SF0355 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $904 $1,040 Implemented