IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0554 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,367 $4,000 Implemented
LE0554 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,979 $40,491 Implemented
LE0554 # 07 Y:2023 07 2023 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $31,394 $144,000 Not Implemented
LE0554 # 08 Y:2023 08 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,658 $49,017 Not Implemented
LE0554 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $873 $2,700 Implemented
LE0554 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,873 $35,440 Implemented
LE0554 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,747 $5,000 Implemented
DL0172 # 06 Y:2017 06 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,647 $428,406 Not Implemented
DL0172 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,972 $48,444 Not Implemented
DL0172 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,657 $32,101 Not Implemented
DL0172 # 05 Y:2017 05 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,205 $0 Not Implemented
DL0172 # 04 Y:2017 04 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,018 $0 Not Implemented
DL0172 # 03 Y:2017 03 2017 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,765 $382 Not Implemented
DL0172 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,948 $192 Not Implemented
DL0172 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,137 $8,000 Implemented
LE0385 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,746 $11,000 Implemented
LE0385 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,210 $3,040 Not Implemented
LE0385 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,455 $1,000 Implemented
LE0385 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,165 $40 Not Implemented
LE0385 # 11 Y:2014 11 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,728 $11,400 Not Implemented
LE0385 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $10,832 $25,185 Implemented
LE0385 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,496 $12,000 Implemented
LE0385 # 08 Y:2014 08 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,231 $4,000 Not Implemented
LE0385 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,022 $1,700 Implemented
LE0385 # 06 Y:2014 06 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,266 $13,200 Not Implemented