IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0359 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,403 $3,100 n/a
MZ0359 # 05 Y:2024 05 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,952 $1,511 n/a
MZ0359 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $609 $1,400 n/a
MZ0359 # 06 Y:2024 06 2024 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $4,846 $17,804 n/a
MZ0359 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $679 $620 n/a
MZ0359 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,203 $14,000 n/a
MZ0351 # 08 Y:2023 08 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $42,244 $83,200 Not Implemented
MZ0351 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,019 $814 Not Implemented
MZ0351 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,304 $0 Not Implemented
MZ0351 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $72,794 $24,018 Not Implemented
MZ0351 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,137 $23,955 Not Implemented
MZ0351 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,603 $3,000 Implemented
MZ0351 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $640 Not Implemented
MZ0351 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,579 $16,300 Not Implemented
MZ0226 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,988 $1,115 Implemented
MZ0226 # 06 Y:2017 06 2017 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $414 $220 Implemented
MZ0226 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,703 $1,760 Implemented
MZ0226 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,081 $4,960 Implemented
MZ0226 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,166 $0 Not Implemented
MZ0226 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,015 $5,450 Implemented
MZ0061 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,994 $5,000 Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
MZ0061 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,184 $0 Implemented
MZ0061 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,019 $0 Implemented
MZ0061 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,947 $2,160 Implemented