IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0773 # 02 Y:2003 02 2003 USE SYNTHETIC LUBRICANT $2,600 $0 Implemented
GT0773 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $460 $841 Not Implemented
GT0773 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,860 $2,500 Implemented
GT0773 # 06 Y:2003 06 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,845 $6,250 Implemented
GT0773 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $2,232 $4,550 Implemented
GT0773 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,023 $1,650 Not Implemented
GT0773 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,410 $0 Not Implemented
GT0773 # 09 Y:2003 09 2003 ADJUST VENTS TO MINIMIZE ENERGY USE $3,600 $3,200 Not Implemented
GT0773 # 11 Y:2003 11 2003 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $6,590 $30,000 Not Implemented
GT0773 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,743 $11,070 Implemented
GT0773 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,215 $33,783 Not Implemented
SF0273 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $3,232 $17,400 Implemented
SF0273 # 16 Y:2003 16 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $7,467 $6,400 Not Implemented
SF0273 # 15 Y:2003 15 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $810 $0 Not Implemented
SF0273 # 13 Y:2003 13 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,475 $72,000 Not Implemented
SF0273 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,355 $84,428 Implemented
SF0273 # 11 Y:2003 11 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,386 $1,395 Not Implemented
SF0273 # 09 Y:2003 09 2003 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,493 $15,750 Not Implemented
SF0273 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $36,828 $60,000 Not Implemented
SF0273 # 07 Y:2003 07 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $946 $1,286 Not Implemented
SF0273 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $728 $728 Implemented
SF0273 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,201 $7,700 Not Implemented
SF0273 # 04 Y:2003 04 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $106,094 $76,555 Not Implemented
SF0273 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,380 $8,846 Not Implemented
SF0273 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,656 $480 Implemented